|
Case Studies
ENGINEERING AND CONSTRUCTION MINING & METALS
Reducing Cycle Times and the benefits of Trend Resolution
The following case study demonstrates how Six Sigma Qualtec(SSQ) reduced costs and the time required to resolve “scope trends” for a leading engineering construction firm trends that indicate possible changes in the scope of a company’s work on a project. SSQ benefited the company’s bottom-line and increased customer satisfaction by identifying causes of delays in trend resolution, revised functional procedures and guidelines for resolving scope trends, and trained project personnel in new procedures and guidelines.
Full Case Study>> (PDF:173K)
|