ENGINEERING AND CONSTRUCTION – MINING & METALS

Reducing Cycle Times and the benefits of Trend Resolution

The following case study demonstrates how Six Sigma Qualtec(SSQ) reduced costs and the time required to resolve “scope trends” for a leading engineering construction firm – trends that indicate possible changes in the scope of a company’s work on a project. SSQ benefited the company’s bottom-line and increased customer satisfaction by identifying causes of delays in trend resolution, revised functional procedures and guidelines for resolving scope trends, and trained project personnel in new procedures and guidelines.

Full Case Study>> (PDF:173K)



Results Driven

Established monthly project reporting metrics and requirements.

Timely trend resolution reduced construction schedule impacts and engineering re-work.

Increased trends resolved within a two-week timeframe from 40% to 75%.